Campus Power Outage - Select Buildings - CORRECTION

*** Notification below has been corrected to indicate the power outage is expected to occur between 12:00 Noon and 2:00 PM ***

As a result of the power outage that occurred July 08, 2013, Dominion Power needs to perform follow-up work on the electrical gear near Child Study. The switch needs to be replaced and work will take approximately 8 hours total, with an estimated 30 minute outage required at the end of the work. Dominion Power will perform this work on Sunday 8/25/13 starting at approximately 6:00 AM. The 30 minute outage is expected to occur between12:00 Noon and  2:00 PM. The following buildings will be affected:

Child Study

Education

Kaufman Hall

Chemistry

Pretlow Planetarium

Kaplan Conservatory

Engineering & Computational Sciences – will be operational under generator power, but will have momentary outage. Building will transfer to generator at 10:00 AM and return to normal after outage is complete.

Posted By: Dana Snyder
Date: Wed Aug 21 08:42:01 EDT 2013