[ skip to content ]

Capital Projects

New Art Building rendering

Barry Arts Building

Instructional building with studio, labs, faculty and administrative offices, Chrysler & Hofheimer Art Libraries located at the north end of Monarch Way across from the Goode Theater.

Rendering of the batting cages

Baseball Batting Cage

The indoor batting cage project will be located at Parker Avenue and 43rd Street.

Brock Commons aerial rendering

Brock Commons

Outdoor amphitheater with water wall and wetlands pathway to 49th Street located at the north end of Monarch Way between the storm water ponds.


Exterior of the Diehn Fine & Performing Arts addition

Diehn & Performing Arts, Phase II

Additional to Diehn with dance, choral and instrumental music space, faculty offices located on 49th Street, connected to the west side of Diehn.

Rendering of the visitor's locker room at Foreman Field

Foreman Field Visitors' Locker Room

The new visitor's locker room will be completed before the 2014 season.

Koch Halll

Koch Hall

Koch Hall Renovations are underway and are expected to be completed at the end of March


Rendering of the Art Studio building

New Art Studio Building

The new Art Studio Building will house studios, labs and faculty offices.

Rendering of the new education building at 43rd Street and Hampton Boulevard

New Education Building

In addition to classrooms, the new Education Building will feature faculty offices, informal learning areas and a multipurpose room.

oceanography-building

Oceanography

Oceanography will be getting new rooftop mechanical equipment.


Rollins Hall floor plan

Rollins Hall

Interior renovations to improve space usage and upgrade finishes in Rollins Hall on Bluestone Avenue.

SRAB

Systems Research & Academic Building

Instructional building with clean room, instrumented labs, faculty offices and support spaces located between Perry Library and Diehn.